Bristol to Conduct Inspection of Pequabuck River Covered Under Downtown

Bristol Public Works vehicle

The City of Bristol will be performing an inspection of the underground conduit that covers the Pequabuck River from the West End to the area east of Main Street.

The inspection of the concrete culverts are scheduled to be performed Thursday 9/21/17.

A portion of the culvert is located beneath Riverside Avenue, therefore Riverside Ave. between Main Street and North Main will be closed during the inspection.

A detour will be provided to maintain access between Riverside Avenue and the downtown area.

Public Works notes that there are no known problems or concerns with the condition of the existing culvert. Inspection of the culvert is part of the Department of Public Works on-going maintenance program.

Leave a Reply

%d bloggers like this: